{"591684":{"#nid":"591684","#data":{"type":"news","title":"Elevator Detour for Pettit Building (MiRC)","body":[{"value":"\u003Cp\u003EThe existing elevator in the Pettit Microelectronics Research Center (MiRC) is undergoing renovations and machinery replacements. This work will require anyone needing elevator access to the first and second floors of Pettit to use the elevators in the Klaus Building or Van Leer Building and then utilize bridges to connect to the Pettit Building. Detailed instructions are posted further down this page.\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EFire Code\/Fire Operation Improvements\u003C\/li\u003E\r\n\t\u003Cli\u003EADA Improvements New lighting\u003C\/li\u003E\r\n\t\u003Cli\u003ENew Controllers and Door Mechanisms\u003C\/li\u003E\r\n\t\u003Cli\u003ENew Cab Finishes\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ECONSTRUCTION DETAILS:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EStart Date: May 15, 2017\u003C\/li\u003E\r\n\t\u003Cli\u003EAnticipated End Date: August 16, 2017\u003C\/li\u003E\r\n\t\u003Cli\u003ENormal working hours: 7am-5pm.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E\u003Cem\u003ECampus Detours or Interruptions:\u003C\/em\u003E\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E1st Floor Access Instructions:\u0026nbsp;\u003Cbr \/\u003E\r\nTake the elevator in Klaus Building to 3rd floor. Exit elevator and proceed across the binary bridge, upon exiting the bridge the Pettit building will be on the left. Proceed to enter the side or front entrance of the Pettit building 1st floor.\u003Cbr \/\u003E\r\n\u003Cbr \/\u003E\r\n2nd Floor Access:\u003Cbr \/\u003E\r\nIn the Van Leer Building, take the elevator to the 3rd floor. Exit the elevator and proceed through the covered walk connecting the Van Leer building to the Pettit building 2nd floor.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe existing elevator in the Pettit Microelectronics Research Center (MiRC) is undergoing renovations and machinery replacements.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"The existing elevator in the Pettit Microelectronics Research Center (MiRC) is undergoing renovations and machinery replacements. "}],"uid":"27705","created_gmt":"2017-05-11 21:13:56","changed_gmt":"2017-05-12 11:45:52","author":"Jessica Rose","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2017-05-11T00:00:00-04:00","iso_date":"2017-05-11T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"35921","name":"Facilities Management"},{"id":"172157","name":"fm-detours"},{"id":"174200","name":"fm-notices"},{"id":"2832","name":"microelectronics"},{"id":"5519","name":"Microelectronics Research Center"},{"id":"61411","name":"Campus Construction"},{"id":"143251","name":"detour"},{"id":"143241","name":"Facilities-detour"},{"id":"143221","name":"Facilities-Notices"},{"id":"142501","name":"FMDetour"}],"core_research_areas":[{"id":"39451","name":"Electronics and Nanotechnology"}],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJessica Rose\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECommunications Officer\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECorey Pressley\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Manager\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jrose@gatech.edu "],"slides":[],"orientation":[],"userdata":""}}}