{"619155":{"#nid":"619155","#data":{"type":"news","title":"Parking Accommodations for New Campus Center Construction","body":[{"value":"\u003Cp\u003EOn Monday, May 6, 2019, construction for the new Campus Center will begin.\u003Cbr \/\u003E\r\nSeveral parking and transit modifications will be implemented.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EUnfortunately, the following parking locations will close permanently to accommodate this project:\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E-W03: parking lots at ISyE and behind Student Center deck\u003C\/p\u003E\r\n\r\n\u003Cp\u003E-Area 3 Visitors Lot\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EYou are welcome to park in your current lots until Sunday, May 5 at 11:59 p.m. (PTS will send email reminders as this date approaches).\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EW03 Permit Customers\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EAll W03 permit customers will be given gate access to the W02-Student Center deck and the W10 CRC parking deck. Access will be valid Saturday, May 4 through August 14, 2019. You will not need to exchange your permit hangtags; however, please make sure your W03 permit hangtag is displayed properly when parking in W02 and W10. (If you prefer to park in W21: Physics\/Boggs lot, please email \u003Ca href=\u0022mailto:info.parking@parking.gatech.edu\u0022\u003Einfo.parking@parking.gatech.edu\u003C\/a\u003E).\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003ERenewals for 2019-2020 parking permits will be available April 1-10, 2019 at \u003Ca href=\u0022https:\/\/driverseat.pts.gatech.edu\/ebusinessprod\/Account\/Portal\u0022\u003Edriverseat.gatech.edu\u003C\/a\u003E. During this period, all current W03 customers may renew their permit for W02-Student Center deck. Permits for 2019-2020 will be valid August 15, 2019 through August 14, 2020. (If you prefer to park in a location other than W02, you may select a location during general permit sales, which begins April 24).\u003Cbr \/\u003E\r\n\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ESmartPark Customers\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EYou are welcome to park in Visitors Area 1, W23-North Campus deck or E81-Tech Square deck using your SmartPark access\/units.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EW02 Construction\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ETo accommodate the design of the new Campus Center, the W02-Student Center deck will be converted to a mixed-use deck for both permit and visitors parking. New entrances and exits will be installed, with construction beginning Saturday, March 16.\u0026nbsp; The W02 parking deck will remain open during construction of the new entrance and exit.\u0026nbsp; However, several spaces will be off-line intermittently to facilitate the construction.\u0026nbsp; Any spaces taken off-line will be marked and permit holders will receive email notices as the date approaches. Construction is expected to be completed in early April. Equipment installation and deck conversion should be completed by May 4.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cbr \/\u003E\r\n\u003Cstrong\u003EArea 3 Visitors Validations\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EUnused Area 3 validations may be exchanged for a new parking location (with the exception of E81-Tech Square parking deck). Please email \u003Ca href=\u0022mailto:info.parking@parking.gatech.edu\u0022\u003Einfo.parking@parking.gatech.edu\u003C\/a\u003E for exchanges.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EBus Parking on Ferst Drive\u003C\/strong\u003E\u003Cbr \/\u003E\r\nComplimentary bus parking spaces on Ferst Drive will be removed. Buses will be allowed to park on Hemphill Avenue starting May 6. To purchase bus parking permits, please email Michelle Williams at \u003Ca href=\u0022mailto:michelle.williams@pts.gatech.edu\u0022\u003Emichelle.williams@pts.gatech.edu\u003C\/a\u003E.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EBus Stop Closure\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe ISyE and Instruction Center bus stop will be closed temporarily starting May 6. Please board the Tech Trolley, Green Route and Red Route at the temporary stop located north of the CRC brick crosswalk. The ISyE\/Instruction Center stop will remain closed throughout the construction.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPedestrian Access\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ESeveral pedestrian walkways will be impeded. Please follow the directional signage along the construction fences for alternate pedestrian routes.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EConstruction Signage and Wayfinding\u003C\/strong\u003E\u003Cbr \/\u003E\r\nPlease obey the instructions found on all wayfinding signage during the construction for your safety and for the safety of everyone on campus.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cbr \/\u003E\r\n\u003Cbr \/\u003E\r\n\u003Cstrong\u003EQuestions and Information\u003C\/strong\u003E\u003Cbr \/\u003E\r\nVisit \u003Ca href=\u0022http:\/\/pts.gatech.edu\u0022\u003Epts.gatech.edu\u003C\/a\u003E for information regarding lot closures, transit changes and bus parking.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EVisit \u003Ca href=\u0022https:\/\/studentcenter.gatech.edu\/\u0022\u003Estudentcenter.gatech.edu\u003C\/a\u003E for information about the construction of the new Campus Center, which will be posted later this week. Also, please attend one of the Student Center\u0026rsquo;s information sessions for more details\/updates:\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EWednesday, March 27, 1:00 \u0026ndash; 2:00 p.m., Student Center Theater\u003C\/li\u003E\r\n\t\u003Cli\u003ETuesday, April 2, 3:00 \u0026ndash; 4:00 p.m., Student Center Theater\u003C\/li\u003E\r\n\t\u003Cli\u003ETuesday, April 2, 5:00 \u0026ndash; 6:00 p.m., Student Center Room 343\u003C\/li\u003E\r\n\t\u003Cli\u003EFriday, April 5, 6:00 \u0026ndash; 7:00 p.m., Student Center Theater\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction of the new Campus Center is scheduled through Summer 2022.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EWe understand that this event may be an inconvenience to you. We appreciate your patience, cooperation and continued support. \u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":[{"value":"Parking Accommodations for New Campus Center Construction"}],"field_summary":[{"value":"\u003Cp\u003EW03 and Area 3 will close permanently. The Student Center Deck will be converted to both permit and visitors parking. The ISyE bus stop will be relocated temporarily.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"W03 and Area 3 will close permanently. The Student Center Deck will be converted to both permit and visitors parking. The ISyE bus stop will be relocated temporarily. "}],"uid":"27555","created_gmt":"2019-03-12 20:38:18","changed_gmt":"2019-03-12 20:38:18","author":"Torise Battle Young","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-03-12T00:00:00-04:00","iso_date":"2019-03-12T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"593256":{"id":"593256","type":"image","title":"Kessler Campanile","body":null,"created":"1499289437","gmt_created":"2017-07-05 21:17:17","changed":"1499289437","gmt_changed":"2017-07-05 21:17:17","alt":"","file":{"fid":"226132","name":"Kessler2.0442077-P16-49.jpg","image_path":"\/sites\/default\/files\/images\/Kessler2.0442077-P16-49.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Kessler2.0442077-P16-49.jpg","mime":"image\/jpeg","size":1139706,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Kessler2.0442077-P16-49.jpg?itok=JRkrVC4P"}}},"media_ids":["593256"],"groups":[{"id":"503491","name":"Parking and Transportation Services"}],"categories":[],"keywords":[{"id":"170","name":"parking"},{"id":"488","name":"transit"},{"id":"168","name":"Transportation"},{"id":"1400","name":"Construction"},{"id":"166965","name":"Student Center"},{"id":"176331","name":"Campus Center"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003Einfo.parking@parking.gatech.edu\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["info.parking@parking.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}