{"626103":{"#nid":"626103","#data":{"type":"news","title":"Sidewalk North of Baker connecting Dalney and State Street will be closed 9\/17\u00a0to 10\/11\u00a0  ","body":[{"value":"\u003Cp\u003E\u003Ca name=\u0022x__MailEndCompose\u0022\u003EAs a continuation of the work at State Street, construction will take place to \u0026nbsp;install\u0026nbsp;a storm water drainage system to better manage run-off from the slope north of the Baker Building.\u0026nbsp; This work will begin on Tuesday, September 17\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;and will last through October 11\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;(weather permitting).\u003C\/a\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ETo ensure safety of pedestrians, the sidewalk North of Baker connecting Dalney and State Street will be closed for the duration of the project from September 17\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;to October 11\u003Csup\u003Eth\u003C\/sup\u003E.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe alternate route will be the sidewalk at 10\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;Street.\u0026nbsp; Also, pedestrians will not be able to travel north on the west side of State Street beyond the crosswalks due to excavation adjacent to the street.\u0026nbsp; It\u0026rsquo;s possible this northbound section of sidewalk on State Street may be able to open up after the manhole work is complete and the sidewalk restored; this condition will be monitored to restore normal foot-travel as quickly as practical.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlease contact me if you have any specific questions about this notification.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EJennifer Disotell\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;Special Projects Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Ca href=\u0022mailto:jennifer.disotell@facilities.gatech.edu\u0022 rel=\u0022noopener noreferrer\u0022 target=\u0022_blank\u0022\u003Ejennifer.disotell@facilities.gatech.edu\u003C\/a\u003E\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe sidewalk North of Baker connecting Dalney and State Street will be closed 9\/17\u0026nbsp;- mid October due to the installation of a stormwater drainage system.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"The sidewalk North of Baker connecting Dalney and State Street will be closed 9\/17 through  mid-October due to the installation of a stormwater drainage system.\u00a0"}],"uid":"35028","created_gmt":"2019-09-12 20:46:17","changed_gmt":"2019-09-18 15:17:10","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-09-12T00:00:00-04:00","iso_date":"2019-09-12T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"626241":{"id":"626241","type":"image","title":"Traffic Control Plan Baker","body":null,"created":"1568658042","gmt_created":"2019-09-16 18:20:42","changed":"1568658042","gmt_changed":"2019-09-16 18:20:42","alt":"map of traffic control plan for Baker drainage install","file":{"fid":"238417","name":"Traffic Control Plan Baker Drainage  (1).jpg","image_path":"\/sites\/default\/files\/images\/Traffic%20Control%20Plan%20Baker%20Drainage%20%20%281%29.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Traffic%20Control%20Plan%20Baker%20Drainage%20%20%281%29.jpg","mime":"image\/jpeg","size":659736,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Traffic%20Control%20Plan%20Baker%20Drainage%20%20%281%29.jpg?itok=Sn7dkt2b"}}},"media_ids":["626241"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"168984","name":"sidewalks"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJennifer Disotell\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;Special Projects Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jennifer.disotell@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}