{"632317":{"#nid":"632317","#data":{"type":"news","title":"Griffin Track Press Box and Grandstands to be leveled.  Plans for site reuse in design phase.","body":[{"value":"\u003Cp\u003EPlease see the attached safety and logistics plan for the Griffin Track Press Box and Grandstands demolition.\u0026nbsp; The project duration will be from 2\/17 \u0026ndash; 3\/13.\u0026nbsp; Pedestrian walkways will not be impacted.\u0026nbsp;If you have any questions or concerns please contact:\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EMitchell Shelton\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-351-7746\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe Griffin Track Press Box and Grandstands are\u0026nbsp;slated for demolition this month.\u0026nbsp; The plans for the site reuse are in the design phase.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"The Griffin Track Press Box and Grandstands to be demolished in the coming weeks.  Plans for reuse of the site are in the design phase."}],"uid":"35028","created_gmt":"2020-02-11 18:23:58","changed_gmt":"2020-02-24 18:28:57","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2020-02-11T00:00:00-05:00","iso_date":"2020-02-11T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"632311":{"id":"632311","type":"image","title":"Griffin Track Press Box and Grandstands to be demolished.  Plans for site reuse in design phase.","body":null,"created":"1581443852","gmt_created":"2020-02-11 17:57:32","changed":"1581455801","gmt_changed":"2020-02-11 21:16:41","alt":"map of Griffin Press Box planned demolition","file":{"fid":"240585","name":"GTAA - Griffin Track - Pres Box demo - Logistic Plan.png","image_path":"\/sites\/default\/files\/images\/GTAA%20-%20Griffin%20Track%20-%20Pres%20Box%20demo%20-%20Logistic%20Plan.png","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GTAA%20-%20Griffin%20Track%20-%20Pres%20Box%20demo%20-%20Logistic%20Plan.png","mime":"image\/png","size":2651036,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTAA%20-%20Griffin%20Track%20-%20Pres%20Box%20demo%20-%20Logistic%20Plan.png?itok=5LAGwaZy"}}},"media_ids":["632311"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"183916","name":"Griffin Track"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EMitchell Shelton\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EGeorgia Institute of Technology \/ Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["mshelton35@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}