{"633584":{"#nid":"633584","#data":{"type":"news","title":"Traffic Delays Around the Campus Center Construction","body":[{"value":"\u003Cp\u003EAtlanta Gas Light\u0026rsquo;s sub-contractor will begin\u0026nbsp;work Friday, March 13, on\u0026nbsp;the gas line installation to the Campus Center. As may be necessary, there will be\u0026nbsp;police supervision for lane closures and traffic control. There is likely to be disruption in the corridor from Means Street to Regents Drive to the project site and along Ferst Drive as they extend service from adequately sized mains along\u0026nbsp;Marietta Street.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":[{"value":"Gas line installation to affect traffic flow near Campus Center."}],"field_summary":[{"value":"\u003Cp\u003ECampus Center gas line installation will affect traffic flow on Means Street, Tech Parkway, Regents Drive and Ferst Drive for at least the next seven\u0026nbsp;days.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Means Street, Tech Parkway, Regents Drive and Ferst Drive will experience traffic flow interruptions for the next several days."}],"uid":"35028","created_gmt":"2020-03-12 20:49:53","changed_gmt":"2020-03-12 21:20:39","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2020-03-12T00:00:00-04:00","iso_date":"2020-03-12T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"633583":{"id":"633583","type":"image","title":"Gas line installation for Campus Center","body":null,"created":"1584045408","gmt_created":"2020-03-12 20:36:48","changed":"1584045408","gmt_changed":"2020-03-12 20:36:48","alt":"map of gas line road closures \/ rerouting for Campus Center","file":{"fid":"241088","name":"Gas line installation for Campus Center map.png","image_path":"\/sites\/default\/files\/images\/Gas%20line%20installation%20for%20Campus%20Center%20map.png","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Gas%20line%20installation%20for%20Campus%20Center%20map.png","mime":"image\/png","size":252322,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Gas%20line%20installation%20for%20Campus%20Center%20map.png?itok=a0X7BF5A"}}},"media_ids":["633583"],"related_links":[{"url":"http:\/\/www.studentcenter.gatech.edu\/campus-center","title":"Student Center"}],"groups":[{"id":"383831","name":"Facilities Management"},{"id":"1214","name":"News Room"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"176331","name":"Campus Center"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003ENicolas Palfrey\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Ca href=\u0022tel:470-363-7520\u0022 rel=\u0022noopener noreferrer\u0022 target=\u0022_blank\u0022\u003E470-363-7520\u003C\/a\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Ca href=\u0022mailto:nicolas.palfrey@facilities.gatech.edu\u0022 rel=\u0022noopener noreferrer\u0022 target=\u0022_blank\u0022\u003Enicolas.palfrey@facilities.gatech.edu\u003C\/a\u003E\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["nicolas.palfrey@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}