{"648995":{"#nid":"648995","#data":{"type":"news","title":"State Street Road Closure July 26 - 30 for Infrastructure Improvements","body":[{"value":"\u003Cp\u003ECampus infrastructure improvements along State Street will begin each day at 6:00 a.m. and end at 2:30 p.m. from July 26 through July 30.\u0026nbsp;Construction activities include saw cutting \/\u0026nbsp;removal\u0026nbsp;of asphalt, hydrovac excavation for the installation of HDPE discharge piping from the chilled water manhole to the existing stormwater catch basin.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EAccess to the Kendeda Building loading dock will be restricted and has been approved by the Building Director and Manager. Signage will be in place indicating road and sidewalk closures.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E\u0026nbsp;\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe installation of\u0026nbsp;pumped discharged piping from the chilled water manhole to an existing stormwater catch basin along State Street begins July 26 and runs through July 30, 6:00 a.m. - 2:30 p.m. daily, weather permitting.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Improvements to the chilled water system along State Street begin July 26."}],"uid":"35028","created_gmt":"2021-07-22 19:17:14","changed_gmt":"2021-07-22 19:20:40","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-07-22T00:00:00-04:00","iso_date":"2021-07-22T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"648994":{"id":"648994","type":"image","title":"State Street Chilled Water Manhole Sump Project July 2021","body":null,"created":"1626980339","gmt_created":"2021-07-22 18:58:59","changed":"1626980339","gmt_changed":"2021-07-22 18:58:59","alt":"map of state street manhole sump project road closure plan","file":{"fid":"246397","name":"state_street_sump_July2021.jpg","image_path":"\/sites\/default\/files\/images\/state_street_sump_July2021.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/state_street_sump_July2021.jpg","mime":"image\/jpeg","size":858441,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/state_street_sump_July2021.jpg?itok=Ve82LVmN"}}},"media_ids":["648994"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"182634","name":"State Street"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003ECristina Fannin\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["cristina.fannin@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}