{"653675":{"#nid":"653675","#data":{"type":"news","title":"City of Atlanta Water Main Installation Impacts Techwood Drive December 20 - 23","body":[{"value":"\u003Cp\u003EDecember\u0026nbsp;20 through Dec. 23, the City of Atlanta will complete the service connections to finalize\u0026nbsp;the 12-inch\u0026nbsp;water main installation that occurred in October along\u0026nbsp;Techwood\u0026nbsp;Drive between North Avenue and 3rd\u0026nbsp;Street\/Bobby Dodd Way (adjacent to\u0026nbsp;Bobby Dodd Stadium).\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe City of Atlanta\u0026nbsp;will also mobilize the week of\u0026nbsp;\u003Cstrong\u003EJanuary 3\u0026nbsp;for 2-3 weeks\u003C\/strong\u003E\u0026nbsp;to complete the final connection of the new main and disconnection of the old.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EDuring the\u0026nbsp;work described above, the northbound lane will be closed during normal business hours\u0026nbsp;(approximately 9\u0026nbsp;a.m. -\u0026nbsp;4\u0026nbsp;p.m.)\u0026nbsp;Monday through Friday.\u0026nbsp;The southbound lane will be used to maintain\u0026nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes\u0026nbsp;of\u0026nbsp;Techwood\u0026nbsp;Drive\u0026nbsp;will be open each night.\u0026nbsp;\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe access drives to\u0026nbsp;Brittain\u0026nbsp;Dining Hall\u0026nbsp;and\u0026nbsp;those\u0026nbsp;in between Cloudman and Glenn\u0026nbsp;Residence Halls\u0026nbsp;will\u0026nbsp;remain open. On-street parking in ER51 along\u0026nbsp;Techwood\u0026nbsp;Drive\u0026nbsp;may be limited.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EDecember\u0026nbsp;20 through Dec. 23, the City of Atlanta will complete the service connections to finalize\u0026nbsp;the installation of a\u0026nbsp;12-inch\u0026nbsp;water main\u0026nbsp;along\u0026nbsp;Techwood\u0026nbsp;Drive between North Avenue and 3rd\u0026nbsp;Street\/Bobby Dodd Way (adjacent to\u0026nbsp;Bobby Dodd Stadium).\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"City of Atlanta Water Main Installation on Techwood Drive enters its final phase Dec. 20."}],"uid":"35028","created_gmt":"2021-12-14 02:45:30","changed_gmt":"2021-12-16 21:34:46","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-12-13T00:00:00-05:00","iso_date":"2021-12-13T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"647960":{"id":"647960","type":"image","title":"Techwood Drive City of Atlanta Water Main installation June 2021","body":null,"created":"1623091041","gmt_created":"2021-06-07 18:37:21","changed":"1623091041","gmt_changed":"2021-06-07 18:37:21","alt":"","file":{"fid":"245970","name":"Techwood Drive Campus Notification June 2021.png","image_path":"\/sites\/default\/files\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png","mime":"image\/png","size":4630199,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png?itok=g1n7hQve"}}},"media_ids":["647960"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"188001","name":"Techwood Drive"},{"id":"188002","name":"Water Main installation"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Ca href=\u0022mailto:mark.wood@facilities.gatech.edu\u0022\u003EMark Wood\u003C\/a\u003E\u003Cbr \/\u003E\r\nProject Manager\u003Cbr \/\u003E\r\nFacilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["mark.wood@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}