{"654424":{"#nid":"654424","#data":{"type":"news","title":"EcoCommons Path Extension Improvements Begin","body":[{"value":"\u003Cp\u003EThe gravel drive between State Street and Atlantic Drive (south of the North Campus Parking Deck) will be closed during construction and will be upgraded to a multi-use path consisting of concrete and asphalt to match the EcoCommons path on the west of State Street.\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003ENorth Campus Parking Deck vehicular and pedestrian circulation will not be affected.\u003C\/li\u003E\r\n\t\u003Cli\u003EPedestrian access between Atlantic Drive and State Street will be via Peachtree Place (north\u0026nbsp;side of parking deck).\u003C\/li\u003E\r\n\t\u003Cli\u003ELandscape Services and Recycling vehicles will access their facilities via Atlantic Drive.\u003C\/li\u003E\r\n\t\u003Cli\u003EDuration of project is three months.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":"","field_summary_sentence":[{"value":"Improvements to the gravel drive located between State Street and Atlantic Drive will occur January - April."}],"uid":"35028","created_gmt":"2022-01-13 18:30:56","changed_gmt":"2022-01-13 18:32:58","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2022-01-13T00:00:00-05:00","iso_date":"2022-01-13T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"654423":{"id":"654423","type":"image","title":"EcoCommons Path Extension January 2022","body":null,"created":"1642098037","gmt_created":"2022-01-13 18:20:37","changed":"1643148287","gmt_changed":"2022-01-25 22:04:47","alt":"pic of site plant for ecocommons path extension","file":{"fid":"248293","name":"EcoCommons Path Extension Pedestrian Circulation During Constructionrev  (2).jpg","image_path":"\/sites\/default\/files\/images\/EcoCommons%20Path%20Extension%20Pedestrian%20Circulation%20During%20Constructionrev%20%20%282%29.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/EcoCommons%20Path%20Extension%20Pedestrian%20Circulation%20During%20Constructionrev%20%20%282%29.jpg","mime":"image\/jpeg","size":428830,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/EcoCommons%20Path%20Extension%20Pedestrian%20Circulation%20During%20Constructionrev%20%20%282%29.jpg?itok=oEU5OA9b"}}},"media_ids":["654423"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"189704","name":"pathway construction"},{"id":"182634","name":"State Street"},{"id":"106251","name":"atlantic drive"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJeremiah Young\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EDesign \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E404-565-3449\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}