{"658321":{"#nid":"658321","#data":{"type":"news","title":"Ferst Drive Traffic Impacted by Water Line Installation May 23 - June 6","body":[{"value":"\u003Cp\u003EInstallation of a new water line will impact traffic along Ferst Drive, between the U.A. Whitaker Building and the Cherry Emerson Building, beginning Monday, May 23 through Monday, June 6. To facilitate installation, one lane of vehicular traffic will be closed from 7:00 a.m. - 5:00 p.m. each day. Both lanes will be re-opened after 5:00 p.m. Flagmen will be onsite to direct traffic throughout the lane closures. Please refer to the attached traffic control plan.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ETraffic will be impacted on Ferst Drive May 23 - June 6 due to a water line installation project.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Traffic will be impacted on Ferst Drive due to the installation of a new water line."}],"uid":"35028","created_gmt":"2022-05-18 19:17:56","changed_gmt":"2022-05-19 17:36:42","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2022-05-18T00:00:00-04:00","iso_date":"2022-05-18T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"658309":{"id":"658309","type":"image","title":"Traffic (WestBound) Plan for Cherry Emerson \/ Ferst Drive water main installation","body":null,"created":"1652899035","gmt_created":"2022-05-18 18:37:15","changed":"1652899035","gmt_changed":"2022-05-18 18:37:15","alt":"","file":{"fid":"249541","name":"GT Cherry Emerson Traffic Control Plan_Page_1.jpg","image_path":"\/sites\/default\/files\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_1.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_1.jpg","mime":"image\/jpeg","size":1026991,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_1.jpg?itok=NB3wni8b"}},"658311":{"id":"658311","type":"image","title":"Traffic (EastBound) Plan for Cherry Emerson \/ Ferst Drive water main installation","body":null,"created":"1652899185","gmt_created":"2022-05-18 18:39:45","changed":"1652899185","gmt_changed":"2022-05-18 18:39:45","alt":"pic of traffic plan for water line installation ferst drive and cherry emerson","file":{"fid":"249542","name":"GT Cherry Emerson Traffic Control Plan_Page_2.jpg","image_path":"\/sites\/default\/files\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_2.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_2.jpg","mime":"image\/jpeg","size":1024475,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_2.jpg?itok=rEw3n4ck"}}},"media_ids":["658309","658311"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"190639","name":"water line"},{"id":"176685","name":"Ferst Drive"},{"id":"6942","name":"Cherry Emerson"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EFenella Bryant\u003Cbr \/\u003E\r\nConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design \u0026amp; Construction\u003Cbr \/\u003E\r\nInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003Efenella.bryant@facilities.gatech.edu\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["fenella.bryant@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}