{"661177":{"#nid":"661177","#data":{"type":"news","title":"Van Leer Chilled Water Project Underway","body":[{"value":"\u003Cp\u003EThe Van Leer Chilled Water Project is underway. Please\u0026nbsp;note the following details:\u003C\/p\u003E\r\n\r\n\u003Col\u003E\r\n\t\u003Cli\u003EDaily work hours are 6:00AM to 3:30PM.\u003C\/li\u003E\r\n\t\u003Cli\u003EEstimated completion date of Thursday, November 10th.\u003C\/li\u003E\r\n\t\u003Cli\u003EConstruction activities include saw cutting \/ removal of asphalt and excavation work for installation of new chilled water piping.\u003C\/li\u003E\r\n\t\u003Cli\u003ESchedule is weather permitting and subject to change.\u003C\/li\u003E\r\n\t\u003Cli\u003ESidewalk closure signage will be provided at both ends of the pedestrian walkway.\u0026nbsp;Construction signage will be posted at regular intervals along the temporary fencing.\u003C\/li\u003E\r\n\u003C\/ol\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe Van Leer Chilled Water Project will be actively under construction until early November.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"The Van Leer Chilled Water Project will be actively under construction until early November."}],"uid":"35028","created_gmt":"2022-09-13 20:24:38","changed_gmt":"2022-09-13 20:39:46","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2022-09-13T00:00:00-04:00","iso_date":"2022-09-13T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"661128":{"id":"661128","type":"image","title":"Van Leer Chilled Water Connection Logistics Plan","body":null,"created":"1663014090","gmt_created":"2022-09-12 20:21:30","changed":"1663014090","gmt_changed":"2022-09-12 20:21:30","alt":"map of  logitistics for  Van Leer chilled water connection","file":{"fid":"250472","name":"Van Leer CHW Connection Logistics Plan_Page_2.png","image_path":"\/sites\/default\/files\/images\/Van%20Leer%20CHW%20Connection%20Logistics%20Plan_Page_2.png","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/images\/Van%20Leer%20CHW%20Connection%20Logistics%20Plan_Page_2.png","mime":"image\/png","size":1568300,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Van%20Leer%20CHW%20Connection%20Logistics%20Plan_Page_2.png?itok=KD_x3pi7"}}},"media_ids":["661128"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"187194","name":"chilled water"},{"id":"125081","name":"Van Leer"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EMitchell Shelton\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPlanning,\u0026nbsp;\u003C\/strong\u003EDesign and\u0026nbsp;Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-351-7746\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["Mitchell.Shelton@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}