{"671636":{"#nid":"671636","#data":{"type":"news","title":"Electrical Expansion Project Enters Phase 2","body":[{"value":"\u003Cp\u003EBeginning Dec. 18, phase 2 of the Loop B project will begin. A new road detour will be in place. Curran Street and 9th. Street will have traffic flowing in the OPPOSITE direction to avoid the road crossing closure at the Curran Street and the 8th Street intersection. Detour signs will be in place and the Georgia Teach Police Department will be assisting with the traffic detour for the first few days to ensure the detour is efficient and safe. The road will reopen to normal operation for Student Move-in from 1\/3\/24-1\/5\/24.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EAs the campus electrical expansion project continues, Loop B enters phase 2 and will require a road detour.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Road detour required for phase 2 of the Loop B electrical expansion project."}],"uid":"35028","created_gmt":"2023-12-19 14:06:07","changed_gmt":"2023-12-19 14:08:38","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2023-12-19T00:00:00-05:00","iso_date":"2023-12-19T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"672613":{"id":"672613","type":"image","title":"Electrical Expansion Project - Loop B","body":"\u003Cp\u003EDetour route for campus electrical expansion project at Curran Street and 9th Street.\u003C\/p\u003E\r\n","created":"1702994213","gmt_created":"2023-12-19 13:56:53","changed":"1702994400","gmt_changed":"2023-12-19 14:00:00","alt":"map of road detour for electrical expansion project","file":{"fid":"255888","name":"Loop B Phase 2.jpg","image_path":"\/sites\/default\/files\/2023\/12\/19\/Loop%20B%20Phase%202.jpg","image_full_path":"http:\/\/tlwarc.hg.gatech.edu\/\/sites\/default\/files\/2023\/12\/19\/Loop%20B%20Phase%202.jpg","mime":"image\/jpeg","size":185308,"path_740":"http:\/\/tlwarc.hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2023\/12\/19\/Loop%20B%20Phase%202.jpg?itok=PnCsBYqg"}}},"media_ids":["672613"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"193112","name":"electrical expansion project"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EChris B. Williams\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EProject Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure \u0026amp; Sustainability\u0026nbsp;\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-553-7197\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["cbwilliams@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}